Shell & Tube Heat Exchangers, Part 2: Designing the Tube Bundle
Triangular vs square pitch, tube diameter and wall thickness, tube length, number of passes, bundle diameter, tubesheet joints, tube inserts and ferrules. An animated tube-count explorer and the rules behind each choice.
SM
Sumit Mathur
16 min read
Part 1 told you how much surface area you need. Part 2 turns that area into hardware: how many tubes, how wide, how long, how thick, in what pattern, and how they're fastened to the tubesheet.
This is Part 2 of 7. Start with Part 1 if U, LMTD or Ft are unfamiliar.
1. The tube layout pattern
Tubes sit on a regular lattice. TEMA names four patterns by the angle between the flow direction and the lattice:
Most tubes per shell (about 15 % more than square), the most turbulence, highest h and highest ΔP
Rotated triangular
60°
Rarely offers anything over 30°, so uncommon
Square
90°
Fewer tubes, lower ΔP, straight cleaning lanes
Rotated square
45°
In-line geometry, but flow deflected; useful when shell-side Reynolds number is below about 2000
The one-line decision rule: if you ever need to clean the shell side mechanically, use square (or rotated square). If the shell side is clean, use triangular. Try it:
The same shell packs about 15 % more tubes on a triangular pitch, and the staggered rows force the shell-side fluid to weave, which raises h and pressure drop. Square pitch leaves straight lanes a cleaning lance can use. Drag the pitch ratio to see the lanes close.
Notice how, as you open up the pitch, the lanes between tubes widen. That is the trade: wider pitch means easier cleaning and lower ΔP but fewer tubes and a bigger shell.
Guidelines that come up repeatedly
Use square pitch when shell-side fouling exceeds about 0.00035 m²·°C/W (0.0004 h·m²·°C/kcal).
Use triangular pitch for a fixed-tubesheet vertical thermosiphon reboiler (boiling inside the tubes), and generally for very clean services.
For horizontal shell-side boiling, square pitch is preferred because the open lanes let vapour escape and prevent vapour blanketing of the bundle.
2. Tube pitch
Pitch is the centre-to-centre distance between adjacent tubes. TEMA sets minimums:
Triangular: at least 1.25 × tube OD.
Square: the greater of 1.25 × OD or OD + 6 mm (so there is always a lane wide enough for a cleaning lance).
Examples. 19 mm tube, square pitch: max(1.25 × 19 = 23.75, 19 + 6 = 25) = 25 mm. 25 mm tube, square pitch: max(31.25, 31) = 31.25 mm.
Pitch is sometimes widened on purpose. High-heat-flux shell-side boilers often need around 1.5 × OD to let vapour escape, and very dirty services (fouling above roughly 0.0008 h·m²·°C/kcal) may justify a slightly larger pitch too. Wider pitch cuts the bundle's tube count, so it is rarely free.
3. Tube outside diameter
Tubes range from roughly ¼″ to 2″ OD. Refineries mostly use 5/8″, ¾″, 1″ and 1½″ (15.9, 19.05, 25.4 and 38.1 mm). Smaller tubes give better heat transfer per unit volume, but cost more to clean and drop more pressure.
OD
Use it when
15.9 mm (⅝″)
Very clean feed/effluent exchangers, where cleaning is not a concern
19.05 mm (¾″)
Tube-side fouling factor below about 0.0003–0.0004 h·m²·°C/kcal, and cooling water in the tubes. The smallest practical size for mechanical cleaning
25.4 mm (1″)
Tube-side fouling above about 0.0004, or when pressure drop is tight
31.75–38.1 mm
Special services (sulphur-recovery boilers), or when ΔP must be kept very low
Real example. A reactor-effluent steam generator with a 0.0004 fouling factor uses 38.1 mm tubes simply to keep tube-side ΔP under 0.7 kg/cm².
4. Tube wall thickness
Tube walls are specified by Birmingham Wire Gauge (BWG). Higher gauge number means a thinner wall:
BWG
mm
inch
10
3.40
0.134
12
2.77
0.109
14
2.11
0.083
16
1.65
0.065
18
1.24
0.049
20
0.89
0.035
Typical minimums for 19 mm tube: BWG 14 for carbon and low-alloy steel, BWG 16 for stainless steel, copper alloys and titanium, and a heavier wall where the unit falls under steam-boiler regulation.
U-tubes are thinned at the bend when they're formed, so the straight tube must start thicker than the code minimum. How much thicker depends on the bend radius relative to the tube diameter.
5. Tube length
Standard lengths are 8, 10, 12, 16 and 20 ft (2.4 to 6.1 m); tall combined-feed exchangers use far longer tubes. In refinery service you'll mostly see 3.66 m (12 ft), 4.88 m (16 ft) and 6.1 m (20 ft).
6.1 m is the preferred length. For the same area, longer tubes mean fewer tubes, a smaller shell, higher tube-side velocity, and less pressure drop than getting the same velocity by adding passes.
A vertical thermosiphon reboiler keeps tubes under 6.1 m.
Check L/D (tube length to shell diameter) lies between roughly 2 and 10. Outside this range the unit is either stubby or too slender to support.
Length is ultimately limited by plot space and the capacity of the bundle puller. For U-tubes, "length" means the straight length.
6. Tube passes
Tube-side passes are how many times the tube fluid goes back and forth along the shell. More passes mean higher velocity, a higher tube-side coefficient and a higher pressure drop, all at once.
Use an even number. Odd pass counts complicate the mechanical design and thermal stress. Passes up to 10 exist.
Keep pass tube counts within about 10 % of each other.
Velocity guide for tube-side fluids: roughly 0.9–2.4 m/s; slurries need at least 1.2 m/s to stay in suspension.
Pass partition layouts (how the partition plates divide the channel): ribbon (parallel lanes), quadrant (a cross) and H-band/combination. They also create bypass lanes where tubes have been left out, which feeds directly into the shell-side leakage streams in Part 3.
7. Bundle diameter
Once the tube count Nt is known you can estimate the bundle diameter from a simple correlation (the constants depend on pitch and number of passes):
Db=do(
Representative constants for 1.25 × OD triangular pitch:
Tube passes
K1
n1
1
0.319
2.142
2
0.249
2.207
4
0.175
2.285
6
0.0743
2.499
The shell diameter is larger than Db by the clearance needed for the bundle construction: about 0.5 in (13 mm) for U-tube or fixed-tubesheet bundles, and up to 3–4 in (75–100 mm) for pull-through floating heads. Tube-count tables or rating software give a precise figure, and the quick estimate is just a starting point.
8. How tubes are fastened to the tubesheet
The tube-to-tubesheet (TTS) joint is the most important seal in the exchanger, since it is what keeps the two fluids apart.
Joint
When
Expanded only
Mild duty. Modern practice uses grooved holes (two grooves about 0.4 mm deep and 3 mm wide, 6 mm apart) rather than plain holes.
Expanded + seal weld
Where even minor leakage between the fluids is unacceptable. A thin weld (throat less than tube wall); take no credit for its strength.
Strength weld + expanded
Large pressure and temperature differences, flammable or explosive service, thin fixed tubesheets with thermal cycling.
Welding heat can loosen the expanded joint, so after welding the tubes are re-expanded hydraulically. Neither the seal weld nor the strength weld usually needs post-weld heat treatment, since the stresses are small. There is no universal rule for choosing between them; it is often written into the client's specification.
9. Tube inserts
Inserts are devices placed inside tubes to fight fouling and boost the inside coefficient. They show up in crude and vacuum unit preheat trains and in fouling reboilers. Three families:
Flexible spiral (tensioned): vibrates axially and radially in the flow, scrubbing deposits and tripping the boundary layer.
Rotating helical insert: the flow spins it, with the same effect.
Fixed wire coil: stationary, firm contact with the wall. It creates turbulence and thins the boundary layer (at a modest ΔP penalty), and is best against temperature-driven fouling.
Inserts can cause mechanical problems themselves; talk to a specialist before installing them.
10. Ferrules
A ferrule is a short tube (a few inches) of metal or ceramic pushed into the inlet end of a tube. It can (i) act as a sacrificial wear piece against erosion and corrosion, (ii) carry extremely high heat past the tubesheet in ~900 °C process boilers, and (iii) distribute liquid onto the tube wall in a falling-film unit.
Summary
Triangular for clean, square for cleanable.
Pitch ≥ 1.25 × OD (square: ≥ OD + 6 mm).
¾″ is the practical floor for tubes you must clean.
6.1 m tubes, L/D between 2 and 10, even number of passes.
Expand grooved joints; weld them only when the duty demands.
Next: Part 3 deals with the shell side, where baffles decide the heat transfer, the pressure drop and the vibration all at once.