With the hydraulic fundamentals in hand, sizing a liquid line is a loop: pick a size, compute velocity and pressure drop, compare against the limits for that service, and repeat until the smallest acceptable size is found. The skill is in knowing the limits, and why they differ so much between a pump suction and a pump discharge.
This is Part 3 of 10. Part 2 covered fittings and equivalent length.
Take the normal flow and apply the design margin (10 % for most process lines).
Get density and viscosity at the conservative condition (the most demanding temperature for pressure drop, usually the coldest, most viscous case).
Assume a size and read its inside diameter for the chosen schedule.
Compute v=Q/A, Re, f, and pressure drop per 100 m with the equivalent length.
Compare with the service's velocity and ΔP limits.
Step to the next standard size and repeat; choose the smallest that passes both. Avoid NPS 1¼, 2½, 3½, 5.
2. Pump suction lines: be generous
A pump suction is the most sensitive place in a plant. Anything that robs pressure there (friction) reduces NPSH available (Part 7), and a line that is too small makes the pump cavitate. So suction lines are sized at low velocities and pressure drops, and the more likely the liquid is to flash, the lower the limits:
Suction condition
NPS ≤ 8: velocity / ΔP
NPS ≥ 10: velocity / ΔP
Non-boiling liquid
1.5 m/s / 0.09 bar per 100 m
3.35 m/s / 0.14
Boiling liquid, ample NPSHa (> ~9 m)
1.2 m/s / 0.07
2.7 m/s / 0.12
Boiling liquid, tight NPSHa (< ~9 m)
0.9 m/s / 0.046
1.8 m/s / 0.07
"Boiling" means a liquid at or near its bubble point at the suction: a reflux drum, a column bottom, a refrigerated liquid. Any pressure loss flashes some vapour. The tighter the NPSH, the lower the allowed velocity. Also keep the suction line as short and straight as practical, with no valves that could throttle it, and run any reducer eccentric, flat side up, to avoid trapping vapour.
3. Pump discharge lines: size for the economics
On the discharge side the fluid is above its vapour pressure with plenty of margin, so the limit is the energy cost and the noise:
Line size
Max velocity
Max ΔP
NPS ≤ 4
~1.8 m/s (6 ft/s)
0.35 bar per 100 m (1.5 psi/100 ft)
NPS 6 – 12
~3.0 m/s (10 ft/s)
0.35
NPS ≥ 14
~3.7 m/s (12 ft/s)
0.35
For lines longer than about 300 m equivalent (1000 ft), a pressure drop of 0.17 bar/100 m is preferred, up to the 0.35 limit only if detailed isometrics exist. Long pipelines can profit from a proper economic-diameter study.
Reciprocating pump lines
Reciprocating pumps pulse (Part 8), so their lines are sized for lower velocity to limit the dynamic pressure surges and the vibration, and the allowance depends on pump speed:
Pump speed
Recommended velocity
< 250 rpm
≤ 0.6 m/s (≈ 2 ft/s)
250 – 330 rpm
≤ 0.45 m/s
> 330 rpm
≤ 0.3 m/s
Suction dampeners and, on the discharge, pulsation dampeners are common.
4. Utilities and special services
Service
Typical limit
Steam condensate, exchanger to steam trap or control valve
≤ 0.1 bar/100 m, ≤ 1.5 m/s (two-phase flashing risk beyond)
Cooling water
about 2.5 – 3 m/s, ~0.35 bar/100 m; ≥ 1 m/s minimum to limit fouling
Fire-water ring main
generally ≤ 10 m/s; check the most remote deluge or hydrant
Lean amine, new piping
≤ 1.2 m/s (existing ≤ 1.8)
Rich amine, new piping
≤ 1.5 m/s (existing ≤ 2.5)
Concentrated sulphuric acid, caustic, brine, salt water
low limits to avoid erosion–corrosion; follow the materials specification
Liquid with suspended solids
high enough to avoid settling, low enough to avoid erosion; typically ≈ 1–4.5 m/s depending on the solids
Refrigerant lines to chillers
design for minimum velocity so oil returns
Corrosive or erosive services carry velocity limits that come from the material, not from economics: the protective film on carbon steel (amine, caustic, sulphuric acid) is stripped at higher velocities, so check the pipe class and the corrosion specialist's limit.
5. Gravity lines
In a gravity line the liquid flows downhill, partly full, with no pump. It is analysed like open-channel flow (Manning or Chézy equations), not as full-bore pressure flow. Slope the line continuously; keep it large enough that it never runs full and unvented, which could create vapour locks or siphoning; and avoid long horizontal sections where two-phase flow could build. Common applications: drains, column downcomers to reboilers, overhead condensate to a receiver.
6. Slurries
Slurries need special treatment because solids can settle:
Homogeneous slurries (fine particles, high concentration) behave almost as a single fluid.
Heterogeneous slurries (large particles, low concentration) have non-uniform solids distribution.
Keep the velocity above the critical (deposition) velocity, the speed below which solids begin to settle in horizontal pipe; it depends on particle size, solids density, concentration, liquid viscosity and the degree of turbulence. Very low-solids water systems (raw water, cooling water) just need a minimum of about 1 m/s. At the same time, don't overshoot: solids erode bends and valves.
7. Try the sizer
Pick a service, a fluid and a flow. The table below checks every standard Schedule 40 size against that service's limits and recommends the smallest that satisfies both. Watch how a suction line ends up a size or two bigger than a discharge line of the same flow:
Interactive – Liquid line sizer: pick a service, set the flow
NPS
ID, mm
Velocity, m/s
ΔP, bar/100 m
Limits
Verdict
1
26.64
34.59
508.976
≤ 1.5 m/s · ≤ 0.09
V & ΔP high
1.5
40.9
14.67
54.334
≤ 1.5 m/s · ≤ 0.09
V & ΔP high
2
52.5
8.91
14.892
≤ 1.5 m/s · ≤ 0.09
V & ΔP high
3
77.92
4.04
1.958
≤ 1.5 m/s · ≤ 0.09
V & ΔP high
4
102.26
2.35
0.492
≤ 1.5 m/s · ≤ 0.09
V & ΔP high
6
154.06
1.03
0.063
≤ 1.5 m/s · ≤ 0.09
✔ recommended
8
202.72
0.60
0.016
≤ 1.5 m/s · ≤ 0.09
oversized
10
254.51
0.38
0.005
≤ 3.35 m/s · ≤ 0.14
oversized
12
303.23
0.27
0.002
≤ 3.35 m/s · ≤ 0.14
oversized
14
333.34
0.22
0.001
≤ 3.35 m/s · ≤ 0.14
oversized
16
381
0.17
<0.001
≤ 3.35 m/s · ≤ 0.14
oversized
18
428.66
0.13
<0.001
≤ 3.35 m/s · ≤ 0.14
oversized
20
477.82
0.11
<0.001
≤ 3.35 m/s · ≤ 0.14
oversized
24
574.64
0.07
<0.001
≤ 3.35 m/s · ≤ 0.14
oversized
Basis: NPS ≤ 8: 1.5 m/s, 0.09 bar/100 m · NPS ≥ 10: 3.35 m/s, 0.14. Design flow = 69m³/h. Always confirm against your project's line-sizing specification.
Each service has its own velocity and pressure-drop ceiling. The sizer applies your design margin to the normal flow, computes velocity and ΔP for every standard size (Schedule 40 IDs, Darcy–Weisbach with Swamee–Jain), and recommends the smallest size that satisfies both.
8. Using charts and the viscosity correction
Before software, designers used pressure-drop charts (ΔP per 100 ft against flow for each size, built for a reference fluid). Two scalings let one chart serve many fluids:
Density: actual ΔP=ΔPchart×SG, since pressure drop is proportional to density at fixed velocity.
Viscosity (turbulent flow only): multiply by (ν/νref)0.2; for a 20 cSt liquid on a 0.6 cSt chart, the factor is about 2.0.
Velocity needs no correction: it is just volumetric flow divided by flow area.
9. Common mistakes
Sizing the discharge on normal flow but checking nothing at turn-up, so the control valve starves (Part 6).
Forgetting that viscosity at cold conditions can be many times the hot value.
Using the pipe's nominal diameter instead of its inside diameter.
Using the same limit for new and for revamp lines.
Putting a reducer in a boiling-liquid suction in a way that traps vapour.
Summary
Suction lines are conservative (NPSH); discharge lines are economic (energy and noise).
Reciprocating pump lines have lower velocities to tame pulsation.
Corrosive and slurry services set their own velocity windows, with both a minimum and a maximum.
Always compute with the real inside diameter and the conservative viscosity.
Part 4 moves from liquids to gases, where density changes along the pipe and the speed of sound becomes a hard limit.